GS2444 "GS1265" African Biomass Energy Conservation PoA Malawi Biomass Conservation (2)
GS-356 ↗ · current registry ID: GS2444
#1016of 1329 in Industrial#71of 92 in Malawi#1450of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard PoA for domestic cookstoves in Malawi has VVB-confirmed additionality and a quantified 10% leakage deduction, but is undermined by a claimed ERR roughly six times the ex-ante lifetime estimate, extensive material findings (including stoves no longer operational at site visit), over 25 corrective actions, and multiple cross-document contradictions in key figures. The project-specific baseline, absence of a stated buffer pool, and data-quality issues in monitoring (duplicate sales entries, missing KPT, inconsistent emission factors) collectively raise significant over-crediting and permanence concerns.
Red Flags
- Claimed ERR of 387,394 tCO2e is approximately 5.9× the ex-ante lifetime estimate of 65,200 tCO2e from the PDD, indicating a severe over-crediting signal
- Site visit found end-user stoves in Malawi and Rwanda were no longer operational, raising reversal/permanence concerns with no buffer pool stated
- No usage and monitoring surveys or WBTs were conducted in Malawi in 2019, yet ERRs were still claimed for that period
- Sales database contained duplicate entries and non-CO2/CO2 emission factors were inconsistent with PoA DD NCV values
- 12 cross-document contradictions identified, including conflicting leakage justifications, ERR figures, FNRB units, and crediting periods
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 19,456 | 19,456 | 0 | |
| 2014 | 75,741 | 75,364 | 377 | |
| 2015 | 80,787 | 80,787 | 0 | |
| 2016 | 37,476 | 37,476 | 0 | |
| 2017 | 37,806 | 37,806 | 0 | |
| 2018 | 35,646 | 877 | 34,769 | |
| 2019 | 21,055 | 20,634 | 421 | |
| Total | 307,967 | 272,400 | 35,567 |
Risk Indicators
VVB-confirmed combined test
stoves found non-operational
10% quantified deduction applied
Project-specific; no reassessment date stated
FPIC and grievance confirmed but evidence gaps noted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →