GS2504 - Voluntary Gold Standard multi-country improved cookstove PoA - Oserian Flower Farm Offset Project 1 - Inkoirienito and Oltepesi
GS-156 ↗ · current registry ID: GS1248
#1167of 1329 in Industrial#144of 157 in Kenya#1626of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove PoA project has a confirmed investment additionality test and a quantified 5% leakage deduction, but is severely undermined by a four-fold gap between the assumed usage rate (95%) and the most recently verified rate (25%), raising serious over-crediting concerns. Ten material findings and six corrective actions in the verification report indicate significant MRV and documentation weaknesses. The absence of a lifetime ex-ante ERR estimate prevents a reliable pro-rata delivery check.
Red Flags
- Usage rate assumed at 95% in the methodology but verified at only 25% in the May 2020 monitoring report — a four-fold overstatement that directly inflates claimed emissions reductions
- Ten material findings and six corrective actions in the 2016 verification report, including missing questionnaires, missing project database, and an ER formula error requiring rounding-down correction
- No lifetime ex-ante ERR estimate found in any available document, making it impossible to verify whether verified reductions are consistent with the original project design
- Crediting period is inconsistent across documents: the 2016 verification report shows an open-ended period from 2013, while the 2020 validation report specifies 2020-07-14 to 2027-07-13
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 1,399 | 1,399 | 0 | |
| 2014 | 3,556 | 3,556 | 0 | |
| 2015 | 3,351 | 3,351 | 0 | |
| 2016 | 2,762 | 2,707 | 55 | |
| 2017 | 1,963 | 1,924 | 39 | |
| 2018 | 4,885 | 4,885 | 0 | |
| 2019 | 5,315 | 5,315 | 0 | |
| 2020 | 7,697 | 7,544 | 153 | |
| Total | 30,928 | 30,681 | 247 |
Risk Indicators
Investment test VVB-confirmed
usage declining
5% quantified deduction
Project-specific; reassessed 2020
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →