Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS4424 VPA1 African Cookstoves and Water Programme

GS-869 ↗ · current registry ID: GS4906

#838of 1329 in Industrial#65of 139 in Rwanda#1238of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.8
Transparency
4.5
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The African Cookstoves and Water Programme in Rwanda has VVB-confirmed additionality and a verified ERR that matches the claimed figure, but is undermined by a major usage-rate discrepancy (99% assumed in the PDD versus roughly 53% verified), a 0% leakage deduction with contradictory justifications across documents, seven material findings in the verification report, and a project-specific baseline with no documented reassessment. The low extraction confidence and multiple cross-document contradictions further erode confidence in the underlying data.

Red Flags

  • Usage rate assumed at 99% in the PDD but verified at approximately 52.74% in the verification report — a gap of nearly 47 percentage points that raises serious over-crediting concerns
  • Leakage deduction of 0% with contradictory justifications: the verification report (June 2023) states 'quantified' while the monitoring report (June 2023) states 'deemed negligible', and no quantified leakage figure is provided in either document
  • Seven material findings in the verification report, including inconsistent ICS unit counts across monitoring report sections, an outdated tracking database used for random sampling, and an undefined 'use vs non-use' criterion
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable, which limits the reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2015
4074070
2016
5,3134,351962
2017
7,7127,70210
2018
6,6576,524133
2019
6,0835,962121
2020
5,3084,0561,252
2021
3,5273,50423
2022
1,7191,68534
Total36,72634,1912,535

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals reported

Leakage

0% deduction, contradictory justification, no quantified figure

Baseline

Project-specific baseline, no reassessment date recorded

Safeguards

Grievance mechanism present (2023), FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents