GS5047 VPA27 African Improved Cookstoves and Clean Water Programme: Nyagatare Safe Water Project VII

GS-1579 ↗ · current registry ID: GS7396

#908of 1329 in Industrial#78of 139 in Rwanda#1326of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard water and cookstove project in Rwanda has VVB-verified additionality and a conservative usage rate, but is undermined by serious material findings (unverified borehole GPS locations, potential double-counting of users, and survey methodology gaps), a questionable 0% leakage deduction for a multi-village water scheme, and multiple cross-document contradictions. The low extraction confidence and legacy document format further weaken the evidentiary base.

Red Flags

  • Borehole GPS locations could not be verified by the VVB; some showed bare land or trees instead of infrastructure, undermining the spatial basis of the ER calculation
  • Potential double counting of users due to overlapping 1 km radii of nearby boreholes, directly inflating the claimed ER
  • 0% leakage deduction applied to a water project serving multiple villages, with the justification shifting between 'quantified' (monitoring report) and 'deemed negligible' (PDD) across documents
  • ERR contradiction: the verification report records 47,308 tCO₂e while the monitoring report records 62,570 tCO₂e for the same period, a 32% discrepancy
  • Four corrective actions were required by the VVB, including recollecting all GPS coordinates and capping the usage rate, indicating the as-submitted data was not fully reliable

Credit Vintages

IssuedRetiredAvailable
2019
3,8353,8278
2020
4,6834,6776
2021
11,2979,1222,175
2022
10,0009,801199
2023
3,45903,459
2024
2,10502,105
Total35,37927,4277,952

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

operational risk from borehole wear

Leakage

0% deduction; justification inconsistent across documents

Baseline

Project-specific baseline; no reassessment date found

Safeguards

FPIC and grievance mechanism per VVB; contradiction with monitoring report

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents