GS5047 VPA28 African Improved Cookstoves and Clean Water Programme: Nyagatare Safe Water Project VIII
GS-1580 ↗ · current registry ID: GS7397
#839of 1329 in Industrial#66of 139 in Rwanda#1239of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard energy-efficiency project in Rwanda (improved cookstoves and safe water) with VVB-confirmed additionality and a combined test, but hampered by a project-specific baseline, a 0% leakage deduction whose justification is contradicted across documents, and a significant project-name mismatch (VPA21 vs VPA28) that undermines confidence in the extracted data. The absence of a verified ERR figure and the fact that 2023 surveys had not been carried out at the time of verification raise material MRV concerns.
Red Flags
- Project name in the header (VPA28, Nyagatare Safe Water Project VIII) does not match the project_name field in the extracted record (VPA21, Nyagatare Safe Water Project I, GS 6189), suggesting documents from a different sub-project may have been mixed into the evidence set.
- Two different total ERR claimed figures (147,220 and 62,570) appear in monitoring reports from the same year (2022), with no explanation for the discrepancy.
- The verification report notes that 2023 surveys had not been carried out at the time of verification, yet the monitoring period is 2023-01-01 to 2023-12-31, creating a gap in the MRV chain.
- Leakage justification is stated as 'quantified' in the 2023 monitoring report but 'deemed negligible' in the 2018 PDD, with a 0% deduction in both cases.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 3,835 | 2,364 | 1,471 | |
| 2020 | 4,683 | 4,677 | 6 | |
| 2021 | 11,250 | 9,238 | 2,012 | |
| 2022 | 9,409 | 9,222 | 187 | |
| 2023 | 4,101 | 0 | 4,101 | |
| 2024 | 2,198 | 0 | 2,198 | |
| Total | 35,476 | 25,501 | 9,975 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, justification contradicted
Project-specific, reassessment not stated
Grievance mechanism present, FPIC not stated
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →