Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA28 African Improved Cookstoves and Clean Water Programme: Nyagatare Safe Water Project VIII

GS-1580 ↗ · current registry ID: GS7397

#839of 1329 in Industrial#66of 139 in Rwanda#1239of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A Gold Standard energy-efficiency project in Rwanda (improved cookstoves and safe water) with VVB-confirmed additionality and a combined test, but hampered by a project-specific baseline, a 0% leakage deduction whose justification is contradicted across documents, and a significant project-name mismatch (VPA21 vs VPA28) that undermines confidence in the extracted data. The absence of a verified ERR figure and the fact that 2023 surveys had not been carried out at the time of verification raise material MRV concerns.

Red Flags

  • Project name in the header (VPA28, Nyagatare Safe Water Project VIII) does not match the project_name field in the extracted record (VPA21, Nyagatare Safe Water Project I, GS 6189), suggesting documents from a different sub-project may have been mixed into the evidence set.
  • Two different total ERR claimed figures (147,220 and 62,570) appear in monitoring reports from the same year (2022), with no explanation for the discrepancy.
  • The verification report notes that 2023 surveys had not been carried out at the time of verification, yet the monitoring period is 2023-01-01 to 2023-12-31, creating a gap in the MRV chain.
  • Leakage justification is stated as 'quantified' in the 2023 monitoring report but 'deemed negligible' in the 2018 PDD, with a 0% deduction in both cases.

Credit Vintages

IssuedRetiredAvailable
2019
3,8352,3641,471
2020
4,6834,6776
2021
11,2509,2382,012
2022
9,4099,222187
2023
4,10104,101
2024
2,19802,198
Total35,47625,5019,975

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contradicted

Baseline

Project-specific, reassessment not stated

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents