Audit Analysis
This Gold Standard cookstove project in Rwanda has a VVB-verified additionality assessment and consistent usage rates, but is undermined by 12 outstanding corrective actions, two material findings (including a verification delay and incomplete surveys), a significant fNRB discrepancy between documents, and the absence of a buffer pool. The project's integrity and claim safety are materially weakened by calculation inconsistencies and the lack of permanence safeguards for a technology subject to breakdown and replacement.
Red Flags
- 12 corrective actions remain open, including incorrect installation dates, unexplained increases in project technology days, missing baseline parameters (Nb,y and Pb,y), and a usage rate error transferred from a US calculation sheet
- fNRB value contradicts between the verification report (0.77) and the monitoring report (0.98) — the higher value in the monitoring report would inflate claimed credits by approximately 27%
- Verification for the period October 2020 to December 2021 was never submitted to SustainCERT due to delays attributed to the VVB itself
- FPIC was not conducted despite the project operating in a community setting in Rwanda
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 6,232 | 6,205 | 27 | |
| 2022 | 9,494 | 9,305 | 189 | |
| 2023 | 806 | 790 | 16 | |
| Total | 16,532 | 16,300 | 232 |
Risk Indicators
VVB-verified combined test
breakdown risk unmitigated
0% deduction; justification contradicted
Project-specific; reassessment date not stated
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →