GS5658 VPA 21: Access to energy for local development and women's empowerment in Cabo Delgado Province, Mozambique

GS-2733 ↗ · current registry ID: GS10776

#317of 1329 in Industrial#6of 51 in Mozambique#515of 1801 in Gold Standard (GS)

5.3/ 10
Integrity
5.8
Transparency
4.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A Gold Standard domestic energy-efficiency PoA in Mozambique with a VVB-confirmed combined additionality test and no reversal risk, but undermined by eight cross-document contradictions—most notably a 2.2× gap between the verified and project-reported ERR figures and conflicting leakage justifications. The project-specific baseline, 0% leakage deduction, and unresolved fNRB unit discrepancy (91 vs 0.91) introduce moderate over-crediting and data-reliability concerns.

Red Flags

  • Verified ERR (13,708 tCO₂e, verification report) is more than double the project-reported ERR (6,238 tCO₂e, monitoring report) for what appears to be a similar reporting window, raising a serious data-reliability question.
  • Leakage justification is contradictory: the verification report (Feb 2023) states leakage was 'quantified' while the later monitoring report (Dec 2025) describes it as 'deemed negligible,' yet the deduction in both cases is 0%.
  • fNRB value appears as 91 in the verification report and 0.91 in the monitoring report—a 100× unit discrepancy that undermines confidence in the emissions calculation.
  • Material findings in the verification report included corrective-action requests on start-date evidence, survey methodology, wood-to-charcoal conversion factor, and grievance-mechanism demonstration, indicating the VVB identified substantive gaps during verification.

Credit Vintages

IssuedRetiredAvailable
2020
1,1241,1240
2021
3,8383,8380
2022
1,276626650
Total6,2385,588650

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No reversal risk (non-forest)

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment date

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents