GS5658 VPA 4: Resilience with Safe Drinking Water in Drought Prone Areas of Bale Zone in Oromia (Ethiopia)

GS-1505 ↗ · current registry ID: GS6749

#1076of 1329 in Industrial#27of 36 in Ethiopia#1518of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
3.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard water-access project in Ethiopia's Bale Zone shows reasonable verified delivery (92% of claimed ERR for the monitoring period) but suffers from significant documentation gaps: no additionality test type is recorded, permanence risk (borehole erosion) is flagged but unaddressed, and 14 material findings with 9 corrective actions undermine confidence in the underlying data. Multiple contradictions across documents—particularly on leakage justification, crediting period, and safeguards—further erode reliability.

Red Flags

  • No additionality test type or VVB confirmation of additionality found in any extracted document
  • 14 material findings including methodology reference errors, AR4 vs AR5 GWP misuse, and water quality testing frequency gaps exceeding 3 months
  • Crediting period contradicts between PDD (2016–2036, 20 years) and monitoring report (2018–2023, 5 years), creating uncertainty about the ex-ante ERR basis
  • Security breakdown in Oromia (Oct 2019) caused a non-conformity notification for delayed monitoring, raising questions about data continuity

Credit Vintages Exhausted

IssuedRetiredAvailable
2018
2442440
2019
3,6833,6830
2020
6,3636,3630
2021
6,1116,1110
2022
6,4636,4630
2023
1,1131,1130
Total23,97723,9770

Risk Indicators

Additionality

No additionality test type or VVB confirmation found in any document

Permanence

Borehole erosion risk flagged

Leakage

0% deduction with contradictory justification (quantified vs deemed negligible)

Baseline

Project-specific baseline; no reassessment date recorded; crediting period contradictory

Safeguards

Safeguards and grievance mechanism confirmed in 2023 verification report but absent in 2020 PDD; FPIC not documented

Double-claim

Neither CCP status nor CORSIA eligibility documented; dual-channel risk cannot be excluded

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents