Skip to main content
GSEnergy Efficiency - DomesticEthiopiaGeneral Methodologyv2.1

GS5658 VPA 5: Resilience with Safe drinking water in Somali Regional State (Ethiopia)

GS-1511 ↗ · current registry ID: GS6750

#844of 1329 in Industrial#20of 36 in Ethiopia#1244of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
3.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A Gold Standard safe drinking water project in Ethiopia's Somali Regional State that displaces firewood/charcoal for cooking, verified by SustainCERT. The project shows broadly consistent emission figures (110% of pro-rata expectation) but suffers from significant gaps in additionality documentation, permanence mechanisms, and safeguards, compounded by 12 material findings and 12 corrective actions identified during verification.

Red Flags

  • No additionality test type or VVB confirmation of additionality found in the extracted record
  • No buffer pool or permanence mechanism stated; no reversal events data available
  • FPIC explicitly not conducted (stakeholder consultation document exists but FPIC is marked as not done)
  • 12 material findings and 12 corrective actions identified in the verification report, including altered MR template, inconsistent SDG values, and flow rate specification errors
  • Crediting period discrepancy: PDD (2020) states 2016–2036 (20 years) while the monitoring report (2024) states 2020–2025 (5 years)

Credit Vintages

IssuedRetiredAvailable
2020
4,0022,7051,297
2021
8,2418,22021
2022
4,1744,1740
Total16,41715,0991,318

Risk Indicators

Additionality

No additionality test type or VVB confirmation found in extracted record

Permanence

no reversal data available

Leakage

0% deduction with thin 'quantified' justification; contradicted by 'deemed negligible' in MR

Baseline

Project-specific baseline; no reassessment date; not yet due under GS rules but not jurisdictional

Safeguards

Safeguards confirmed in VR but not in MR; FPIC not conducted; grievance mechanism present per MR

Double-claim

CORSIA and CCP status not stated; dual-channel risk cannot be excluded

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents