Skip to main content
GSEnergy Efficiency - DomesticMadagascarGeneral Methodologyv2.1

GS5658 VPA 9: Water is Life - Phase II, Madagascar

GS-1515 ↗ · current registry ID: GS7311

#629of 1329 in Industrial#8of 26 in Madagascar#956of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.8

Audit Analysis

A Gold Standard domestic energy-efficiency project in Madagascar (displacing thermal energy) with VVB-confirmed additionality but significant quality concerns: nine corrective action requests in the verification report, a project-specific baseline with no recorded reassessment date, and a claimed ERR that exceeds the lifetime ex-ante estimate. The project's safeguards documentation (FPIC, grievance mechanism) is positive, but the absence of verified ERR figures and multiple cross-document contradictions limit confidence in the credit claims.

Red Flags

  • Nine corrective action requests (CAR-1 through CAR-9) were raised in the 2023 verification report, indicating multiple unresolved or recently resolved compliance issues
  • Total ERR claimed (50,617 tCO₂e) exceeds the lifetime ex-ante estimate (38,586 tCO₂e), suggesting potential over-crediting of approximately 31% above the pre-project projection
  • Reversal risk is explicitly 'not addressed' in the extracted record and no buffer pool percentage is stated, leaving permanence unquantified
  • The verification report references 'GS5658 VPA 7' while the project under review is 'VPA 9 – Phase II', raising a question about whether the correct VPA documentation was used

Credit Vintages Exhausted

IssuedRetiredAvailable
2018
9969960
2019
9,0319,0310
2020
2,0132,0130
2021
1,7791,7790
2022
1,6131,6130
2023
1,4111,4110
Total16,84316,8430

Risk Indicators

Additionality

VVB-confirmed but test type unspecified

Permanence

Reversal not addressed

Leakage

0% deduction, deemed negligible; 2022 report said quantified

Baseline

Project-specific; reassessment date not found

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents