Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS7591 VPA 10 Northern Uganda Safe Water Project

GS-2210 ↗ · current registry ID: GS7595

#1121of 1329 in Industrial#144of 163 in Uganda#1572of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.2
Transparency
5.0
Claim Safety
3.2
Documentation
4.0

Audit Analysis

The Northern Uganda Safe Water Project (VPA 10) has confirmed additionality and no reversal events, but is beset by serious operational and compliance problems: the project is in non-compliance with its methodology's monitoring requirements, multiple deviation requests were denied, and issuance was suspended for non-compliance periods. The verified emissions reductions for a two-month monitoring period (237,039 tCO₂e) are roughly 38 times the pro-rata share of the lifetime ex-ante estimate (300,000 tCO₂e over ~8 years), raising a major over-crediting concern. Extensive borehole breakdowns, vandalism, and water-quality complaints further undermine confidence in the project's delivery.

Red Flags

  • Verified ERs of 237,039 tCO₂e for a 2-month period are ~38× the pro-rata expectation of ~6,250 tCO₂e derived from the 300,000 tCO₂e lifetime ex-ante estimate — a severe over-crediting signal
  • Project is in non-compliance with methodology monitoring requirements (parameter SDWS 23); all deviation requests for this parameter were denied and issuance was suspended for non-compliance periods
  • Multiple boreholes reported broken, vandalised, or abandoned (OYA115, OYA256, OYA257, KWA003/012/014/021), undermining the assumption that safe water is continuously available
  • Leakage deduction is 0% with only a 'deemed negligible' justification, despite the project-specific baseline and the fact that displaced thermal energy use could shift to other locations
  • Nine data contradictions across documents, including conflicting crediting-period dates, additionality status, fNRB method, and leakage justification

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

borehole failures risk service loss

Leakage

0% deduction, 'deemed negligible' only; no quantified assessment

Baseline

Project-specific baseline; reassessed 2024 but not jurisdictional

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents