Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS7591 VPA 11 Northern Uganda Safe Water Project

GS-2211 ↗ · current registry ID: GS7596

#780of 1329 in Industrial#97of 163 in Uganda#1168of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

The Northern Uganda Safe Water Project has confirmed additionality (combined test, VVB-verified) and no formal reversal events, but is beset by extensive operational problems — borehole vandalism, community abandonment, prolonged non-functionality, water-quality complaints, and non-compliance with methodology monitoring requirements that led to suspended issuance. The 0% leakage deduction justified only as 'deemed negligible' is weak for a project where households could revert to firewood, and the absence of a buffer pool leaves permanence unsecured. Documentation quality is poor, with dozens of corrective actions, multiple inter-document contradictions, and low extraction confidence.

Red Flags

  • Project is in non-compliance with methodology monitoring requirements for parameter SDWS 23; issuance is suspended for periods of non-compliance and no further deviation can be granted
  • Multiple boreholes vandalized (OYA256), abandoned by communities (OYA257), or non-functional for close to a year (OYA115), indicating significant partial-reversal risk despite no formal reversal event being reported
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, in a project where households can easily revert to firewood for water heating
  • Crediting period start date is inconsistent between the verification report (2020-02-25) and the validation report (2025-02-05), a discrepancy of five years that undermines the reliability of the ex-ante ERR baseline

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

borehole failures and abandonment reported

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents