GS7591 VPA 33 Zambian Central Province Safe Water
GS-2532 ↗ · current registry ID: GS7688
#714of 1329 in Industrial#13of 33 in Zambia#1066of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard water-borehole rehabilitation project in Zambia has confirmed additionality and no reversal events, but is undermined by extensive operational failures (77% water-quality pass rate, multiple collapsed or dried-up boreholes, high mechanical failure rates) and a 0% leakage deduction that is contradicted by an earlier 5% figure in the validation report. The ERR figures are internally consistent for the latest monitoring period (claimed = verified = 30,708 tCO₂e), but the absence of a lifetime ex-ante estimate and contradictions across documents limit confidence in the long-term claim.
Red Flags
- 23% of boreholes failed water-quality testing in the latest monitoring period, directly threatening the delivery of safe-water access that underpins the ER claim
- Multiple boreholes reported as collapsed, dried up, or with low water levels (e.g., MUM02234 with 161 down days in 2024), indicating the physical infrastructure is degrading
- Leakage deduction of 0% with a 'deemed negligible' justification is contradicted by a 5% deduction in the 2025 validation report, and no buffer pool is stated
- Several corrective actions are explicitly marked as 'ineffective' (MR template adherence, parameter consistency, SDG impact calculation), suggesting systemic MRV weaknesses
- fNRB method changed between documents from national default (0.74) to local field (0.86), a 16% increase in the reduction factor that inflates ERs
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 1,583 | 1,583 | 0 | |
| 2021 | 35,220 | 35,220 | 0 | |
| 2022 | 42,243 | 41,749 | 494 | |
| 2023 | 53,000 | 38,568 | 14,432 | |
| 2024 | 48,345 | 0 | 48,345 | |
| 2025 | 11,806 | 0 | 11,806 | |
| Total | 192,197 | 117,120 | 75,077 |
Risk Indicators
VVB-confirmed combined test
23% borehole failure rate
0% deduction contradicted by earlier 5%
Project-specific; reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →