Skip to main content
GSEnergy Efficiency - DomesticZambiaGeneral Methodologyv2.1

GS7591 VPA 33 Zambian Central Province Safe Water

GS-2532 ↗ · current registry ID: GS7688

#714of 1329 in Industrial#13of 33 in Zambia#1066of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.3
Transparency
5.0
Claim Safety
4.8
Documentation
5.5

Audit Analysis

This Gold Standard water-borehole rehabilitation project in Zambia has confirmed additionality and no reversal events, but is undermined by extensive operational failures (77% water-quality pass rate, multiple collapsed or dried-up boreholes, high mechanical failure rates) and a 0% leakage deduction that is contradicted by an earlier 5% figure in the validation report. The ERR figures are internally consistent for the latest monitoring period (claimed = verified = 30,708 tCO₂e), but the absence of a lifetime ex-ante estimate and contradictions across documents limit confidence in the long-term claim.

Red Flags

  • 23% of boreholes failed water-quality testing in the latest monitoring period, directly threatening the delivery of safe-water access that underpins the ER claim
  • Multiple boreholes reported as collapsed, dried up, or with low water levels (e.g., MUM02234 with 161 down days in 2024), indicating the physical infrastructure is degrading
  • Leakage deduction of 0% with a 'deemed negligible' justification is contradicted by a 5% deduction in the 2025 validation report, and no buffer pool is stated
  • Several corrective actions are explicitly marked as 'ineffective' (MR template adherence, parameter consistency, SDG impact calculation), suggesting systemic MRV weaknesses
  • fNRB method changed between documents from national default (0.74) to local field (0.86), a 16% increase in the reduction factor that inflates ERs

Credit Vintages

IssuedRetiredAvailable
2020
1,5831,5830
2021
35,22035,2200
2022
42,24341,749494
2023
53,00038,56814,432
2024
48,345048,345
2025
11,806011,806
Total192,197117,12075,077

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

23% borehole failure rate

Leakage

0% deduction contradicted by earlier 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents