GS7591 VPA 38 Zambia Western Province Safe Water Project
GS-2970 ↗ · current registry ID: GS11011
#914of 1329 in Industrial#22of 33 in Zambia#1333of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe-water project in Zambia displaces thermal energy from water boiling and has a VVB-confirmed additionality test with no reversal events. However, the verification process surfaced an extensive list of material findings and corrective actions—including a multiplication-factor error in the baseline equation and an incorrect total ER value—raising serious concerns about the robustness of the emissions calculations. The 0% leakage deduction, absence of a stated buffer pool, and multiple cross-document contradictions further weaken confidence in the project's integrity and data reliability.
Red Flags
- Corrective action required removal of a multiplication factor of 2 from the baseline emission equation, indicating the initial baseline may have been double-counted
- Incorrect total ER value was stated on page 41 of the Monitoring Report, and the verified ERR exactly equals the claimed ERR (113,630 tCO2e), which is atypical
- Leakage deduction is 0% with only a generic 'quantified' justification, with no specific methodology or magnitude described
- Extensive list of 40+ corrective actions spanning the MR, ER spreadsheet, and VPA-DD indicates systemic quality-control weaknesses
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,053 | 1,053 | 0 | |
| 2023 | 42,379 | 9,465 | 32,914 | |
| 2024 | 60,000 | 11,860 | 48,140 | |
| 2025 | 21,534 | 0 | 21,534 | |
| Total | 124,966 | 22,378 | 102,588 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction, generic justification
Project-specific; equation error found
FPIC, grievance, benefit sharing documented
CCP and CORSIA status unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →