GS7591 VPA 47 Malawi Improved Cookstove Project
GS-3195 ↗ · current registry ID: GS11206
#785of 1329 in Industrial#58of 92 in Malawi#1173of 1801 in Gold Standard (GS)
Audit Analysis
The Malawi improved cookstove project has a verified additionality assessment and no reversal events, but is undermined by an extensive list of material findings and corrective actions, a significant drop in verified usage rate (from 90% to 62%), a 0% leakage deduction with contradictory justifications across documents, and multiple unresolved data discrepancies. The project delivered roughly 94% of the pro-rata ex-ante expectation for the elapsed crediting period, but the volume of clarifications and corrective actions raises serious questions about the robustness of the underlying MRV data.
Red Flags
- Stove usage rate dropped from 90% (2021) to 62% (2022) per the monitoring report, yet the ex-ante assumption was 80% — a 18-percentage-point gap that directly inflates claimed reductions
- 21 corrective actions and 20+ material findings across the verification and validation reports, including missing 2021 monitoring survey, calculation errors in PTDs, and inconsistent fNRB values (0.86 vs 0.97)
- Leakage deduction of 0% is justified as 'quantified' in the verification report but 'deemed negligible' in the monitoring report — contradictory rationales for the same zero deduction
- Claimed and verified ERR figures are identical (71,161 tCO2e), offering no independent verification signal and raising the question of whether the VVB independently recalculated the figure
- FPIC status is contradictory: the 2023 validation report records it as not conducted, while the 2025 validation report records it as conducted — the more recent document is privileged but the gap is unexplained
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 14,875 | 0 | 14,875 | |
| 2021 | 34,527 | 0 | 34,527 | |
| 2022 | 21,759 | 0 | 21,759 | |
| Total | 71,161 | 0 | 71,161 |
Risk Indicators
VVB-confirmed combined test
usage declining
0% deduction with contradictory justifications
Project-specific baseline, reassessed 2024
FPIC contradiction; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →