Skip to main content
GSEnergy Efficiency - DomesticRwandaVintage 2022General Methodologyv2.1

GS7591 VPA 53 Improved Cookstove Distribution in Kayonza, Bugesera and Nyamasheke Districts of Rwanda (GS12227)

GS-4175 ↗ · current registry ID: GS12227

#215of 1329 in Industrial#19of 139 in Rwanda#371of 1801 in Gold Standard (GS)

5.5/ 10
Integrity
5.0
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A Gold Standard cookstove distribution project in Rwanda with confirmed additionality and quantified leakage, but undermined by an unusually high volume of material findings (over 20 items) and six corrective actions that point to significant documentation and data-quality weaknesses. The project-specific baseline and absence of a buffer pool or lifetime ex-ante estimate limit confidence in the long-term integrity of the claims.

Red Flags

  • Over 20 material findings identified during verification, including date inconsistencies, SDG value discrepancies, parameter unit errors (per-day vs per-week), and multiple unresolved clarifications across PoA and VPA levels
  • No lifetime ex-ante emission reduction estimate found in the extracted record, preventing a pro-rata over/under-delivery check against the 163,563 tCO₂e verified for 2024
  • Crediting period contradiction: the 2025 validation report lists a period of 2025-02-05 to 2030-02-04, while the 2024 monitoring report states 2021-08-17 to 2027-12-27, suggesting a possible renewal that is not clearly documented

Credit Vintages

IssuedRetiredAvailable
2022
11,7755,9475,828
2023
57,301057,301
2024
36,4762,69033,786
Total105,5528,63796,915

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

5% quantified deduction

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents