Gu’ertu River Stage VI and VII 17MW Bundled Hydropower Project

CDM-3991 ↗

#372of 1935 in Renewable energy#142of 1084 in China#240of 1459 in CDM (UNFCCC)#276of 1287 in ACM0002

6.0/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
5.0
Documentation
6.5

Audit Analysis

A 17 MW small-scale hydropower project under CDM with VVB-confirmed additionality and inherent permanence (avoidance-type project), but undermined by contradictory baseline methodology descriptions, inconsistent leakage treatment, and a significant discrepancy in reported emission reduction figures between monitoring reports. The project is functionally sound for its era but suffers from data reliability gaps that limit confidence in the exact magnitude of claimed reductions.

Red Flags

  • Total ERR figures differ by more than 2× between the 2016 monitoring report (169,448 tCO₂e) and the 2022 monitoring report (78,309.841 tCO₂e), with no clear explanation of whether these refer to different periods or represent a revision
  • Baseline methodology is described as 'project-specific' in the 2022 monitoring report but 'jurisdictional' in the 2010 validation report — a fundamental methodological contradiction
  • Leakage deduction is 0% with justification shifting from 'deemed negligible' (2016) to 'not addressed' (2022), leaving the more recent record without a defensible rationale
  • Grid emission factor is from 2007 and no baseline reassessment date is recorded in any available document

Credit Vintages

IssuedRetiredAvailable
2013
80,363080,363
2017
169,4270169,427
2023
76,017076,017
Total325,8070325,807

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, inconsistent justification

Baseline

Method contradiction, no reassessment date

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents