Skip to main content
CDMWindChinaACM0002

Guangdong Nan’ao Huaneng 45.05MW Wind Power Project

CDM-0299 ↗

#1426of 1935 in Renewable energy#873of 1084 in China#1164of 1459 in CDM (UNFCCC)#1095of 1287 in ACM0002

4.5/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A 45 MW onshore wind project in Guangdong, China, validated under CDM with a jurisdictional baseline and a 7-year crediting period (2013–2020). The project is inherently low-risk in terms of permanence and leakage, but the extracted record lacks monitoring and verification data, and a material finding required correction of grid emission factors. Overall documentation is thin, with low extraction confidence and no verification report available.

Red Flags

  • Material finding in the validation report: grid emission factors (EFgrid,OM,y, EFgrid,BM,y, EFgrid,CM,y) were outdated and required updating per the 2016 China District Power Grid Baseline Emission Factor, indicating the initial baseline calculation was not fully current.
  • No monitoring or verification report is present in the extracted record; total verified ERR is not available, so actual delivery against the 514,087 tCO₂e lifetime claim cannot be confirmed.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the structured data.

Credit Vintages

IssuedRetiredAvailable
2008
29,690029,690
2010
195,3860195,386
2011
70,709070,709
2012
88,253088,253
2013
55,964055,964
Total440,0020440,002

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Wind generation – no reversal risk

Leakage

0% deduction, standard for wind

Baseline

Jurisdictional, reassessed 2018

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents