Guangdong Xinyi Qianpai Wind Power Project

CDM-6844 ↗

#368of 1935 in Renewable energy#138of 1084 in China#236of 1459 in CDM (UNFCCC)#272of 1287 in ACM0002

6.0/ 10
Integrity
6.8
Transparency
5.2
Claim Safety
6.2
Documentation
4.8

Audit Analysis

A CDM wind power project in China with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline, both appropriate for the sector. However, a significant discrepancy in the total emissions-reduction figure between the PDD and the validation report, combined with low document-extraction confidence and 19 material findings at validation (all since resolved), limits confidence in the data trail. The project is a straightforward avoidance-type wind installation with minimal reversal or leakage risk.

Red Flags

  • Total ERR figure differs by a factor of ~7 between the PDD (545,412 tCO₂e) and the validation report (77,916 tCO₂e); the PDD value is privileged as the lifetime ex-ante estimate, but the discrepancy is unexplained in the available record.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted data.
  • Nineteen material findings (CAR01–06, CL01–09) were raised during validation, indicating substantial documentation and calculation gaps at the time of submission, although all were subsequently resolved.
  • Grid emission factor is dated 2011; no evidence of an updated or reassessed baseline value was found in the extracted record.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional grid EF (2011)

Safeguards

Mentioned but FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents