Guangdong Yudean Xuwen Yongshi 49.5MW Wind Power Project in Zhanjiang City, Guangdong Province
#846of 1935 in Renewable energy#434of 1084 in China#597of 1459 in CDM (UNFCCC)#659of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project under CDM with a jurisdictional baseline and a full-period verification showing claimed and verified ERRs of 459,767 tCO₂e. The project is structurally sound for a wind avoidance credit, but the extracted record lacks explicit additionality documentation, buffer-pool details, and several MRV parameters, leaving moderate evidence gaps. A minor material finding on parameter alignment with the PDD was noted but required no corrective action.
Red Flags
- Additionality test type and VVB confirmation are not stated in any extracted document, creating an evidence gap on a core CDM requirement
- Contradiction between the validation report (jurisdictional baseline) and the appendix (project-specific baseline) on baseline methodology
- No buffer pool percentage is recorded, leaving permanence risk unquantified despite the absence of reversal events
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Not stated in extracted record
Wind avoidance, no reversal risk
Negligible, justified for wind
Jurisdictional but contradicted in appendix
Mentioned, benefit sharing described, no FPIC/grievance deta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →