Guangxi Baise Dongsun Hydropower Project

CDM-3272 ↗

#1172of 1935 in Renewable energy#679of 1084 in China#896of 1459 in CDM (UNFCCC)#916of 1287 in ACM0002

4.9/ 10
Integrity
6.2
Transparency
3.2
Claim Safety
5.8
Documentation
3.0

Audit Analysis

A small-scale hydro displacement project under CDM with a confirmed additionality test and jurisdictional baseline, but the available record is limited to the validation report and PDD with no monitoring data, low extraction confidence, and two material findings requiring corrective action. The leakage treatment (0% deduction, deemed negligible) is reasonable for this project type but is undermined by a contradiction between documents. Overall, the project design is sound but the evidentiary base is thin.

Red Flags

  • Two material findings (CARs) at validation: monitoring equipment descriptions and forecast load factor were missing from the PDD, and the required methodological tool was not listed in PDD tables B.7.1 and B.7.3
  • Contradiction on leakage treatment: the validation report (Nov 2017) states leakage was 'deemed negligible' while another document references a 'quantified' approach — the basis for the 0% deduction is unclear
  • No monitoring report or verified ERR data found in the extracted record; the project's actual performance over its 7-year crediting period (ending Dec 2024) is unverified
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2012
32,802032,802
2013
55,752055,752
Total88,554088,554

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Hydro generation – low inherent reversal risk

Leakage

0% deduction, contradiction in justification

Baseline

Jurisdictional, reassessed 2017

Safeguards

Mentioned and benefit sharing described, but no FPIC or grie

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents