Guangxi Bajiangkou Hydropower Project
#48of 1935 in Renewable energy#9of 1084 in China#32of 1459 in CDM (UNFCCC)#31of 1287 in ACM0002
Audit Analysis
The Guangxi Bajiangkou 90 MW hydropower project demonstrates solid additionality (IRR without CERs of 6.76% well below the Chinese hurdle rate) and a jurisdictional grid-emission-factor baseline, with verified emissions reductions closely matching claimed values (99.1% delivery). The main concerns are a contradiction in baseline method characterization between the 2011 and 2012 monitoring reports, and the absence of leakage treatment in the original validation report. Overall, this is a well-documented CDM hydro project with moderate data inconsistencies that do not fundamentally undermine the credit claims.
Red Flags
- Baseline method described as 'project-specific' in the 2011 monitoring report but 'jurisdictional' in the 2012 monitoring report — the more recent 2012 characterization is privileged, but the inconsistency raises questions about baseline robustness
- The 2008 validation report did not address leakage at all; the 2012 monitoring report later deemed it negligible with a 0% deduction, leaving a gap in the original validation record
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 577,882 | 0 | 577,882 | |
| 2012 | 240,987 | 0 | 240,987 | |
| 2013 | 243,042 | 0 | 243,042 | |
| Total | 1,061,911 | 0 | 1,061,911 |
Risk Indicators
VVB-confirmed combined test; IRR below hurdle
Avoidance project; no reversal risk
0% deemed negligible; absent from validation
Jurisdictional EF; method contradiction across reports
Safeguards and benefit sharing mentioned; FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →