Guangxi Dahua Hydropower Project
#1525of 1935 in Renewable energy#964of 1084 in China#1305of 1459 in CDM (UNFCCC)#1162of 1287 in ACM0002
Audit Analysis
The Guangxi Dahua Hydropower Project is a small-scale CDM hydro project with a jurisdictional baseline and a 7-year crediting period (2018–2025). The extracted record contains a significant discrepancy between the PDD and the validation report on both the total emission reduction figure (a roughly 7× gap) and the baseline method, which undermines confidence in the project's quantification. Additionality, monitoring data, and safeguards details are largely absent from the available documents, leaving material evidence gaps.
Red Flags
- The PDD states a total emission reduction of 799,309 tCO₂e while the validation report (the independent VVB assessment) records only 114,187 tCO₂e — a roughly 7× discrepancy that raises serious over-crediting concerns.
- The PDD describes the baseline as project-specific while the validation report classifies it as jurisdictional; the two documents disagree on a fundamental methodological choice.
- No monitoring report or monitoring period is present in the extracted record despite the project being mid-crediting-period (2018–2025), leaving actual performance unverified.
- Additionality test type and VVB confirmation are not stated in the extracted data, creating an evidence gap on a core CDM requirement.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test not stated in extracted record; VVB report exists but d
no reversal events; hydro-specifi
0% deduction, deemed negligible — plausible for small hydro
Jurisdictional per VVB but contradicted by PDD; grid EF 2017
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →