Guangxi Nabi Hydropower Project
#683of 1935 in Renewable energy#328of 1084 in China#471of 1459 in CDM (UNFCCC)#528of 1287 in ACM0002
Audit Analysis
The Guangxi Nabi Hydropower Project is a straightforward small-hydro CDM project under the well-established ACM0002 methodology, displacing grid electricity with a jurisdictional baseline. The validation phase was completed by CTC with a combined additionality test, though three administrative findings (late notification, PDD version, start date) were raised and closed. The principal limitation is the absence of any monitoring or verification data in the available record, leaving the 596,526 CER claim unconfirmed against actual performance.
Red Flags
- No monitoring reports or verified ERR figures are present in the extracted record; the 596,526 CER lifetime claim cannot be cross-checked against actual generation.
- Three material findings were raised during validation (late renewal notification, outdated methodology version in PDD v03, incorrect crediting-period start date), all closed but indicating procedural sloppiness.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 38,648 | 0 | 38,648 | |
| Total | 38,648 | 0 | 38,648 |
Risk Indicators
Combined test, VVB-confirmed
Grid-displacement hydro, low reversal risk
0% deemed negligible, thin justification
Jurisdictional, reassessed 2018
Mentioned, benefit sharing described, no FPIC/grievance deta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →