Guangxi Xiafu Hydro Power Project

CDM-1604 ↗

#436of 1935 in Renewable energy#170of 1084 in China#282of 1459 in CDM (UNFCCC)#324of 1287 in ACM0002

5.9/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

The Guangxi Xiafu Hydro Power Project is a straightforward 49.5 MW small-hydro CDM project using the well-established ACM0002 methodology, with VVB-confirmed investment additionality and a standard jurisdictional grid-emission-factor baseline. However, five cross-document contradictions—including discrepant ERR figures, conflicting additionality test descriptions, and inconsistent baseline characterisations—introduce meaningful data-reliability uncertainty. The 2005 grid emission factor, while appropriate at registration, has not been shown to have been updated, and the absence of a buffer pool (though not critical for hydro) and several unresolved procedural corrective actions temper confidence.

Red Flags

  • Five contradictions across documents, including two different claimed ERR values (97,154 vs 135,953) from monitoring reports only two months apart, and the VVB-verified figure (116,905) exceeding the later claimed value by ~20%
  • Grid emission factor of 0.8325 tCO₂/MWh is from 2005; no evidence of periodic update is found in the extracted record, raising the risk of overstated reductions as China's grid has decarbonised
  • Additionality test type is described as 'investment' in the 2012 monitoring report but 'combined' in the 2008 validation report, creating ambiguity about the actual test applied
  • Baseline method is characterised as 'jurisdictional' in the 2012 report but 'project' in the 2010 report, undermining clarity on the baseline approach

Credit Vintages

IssuedRetiredAvailable
2011
151,0700151,070
2012
240,3610240,361
2013
97,154097,154
Total488,5850488,585

Risk Indicators

Additionality

VVB-confirmed but test type inconsistent across documents

Permanence

Hydro project – no inherent reversal risk

Leakage

0% deduction, deemed negligible – appropriate for grid-conne

Baseline

Jurisdictional grid-EF baseline, but 2005 vintage and method

Safeguards

Safeguards mentioned and benefit-sharing described, but FPIC

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents