Guangxi Xinglong Small Hydropower Project
#1107of 1935 in Renewable energy#617of 1084 in China#840of 1459 in CDM (UNFCCC)#360of 806 in AMS-I.D
Audit Analysis
The Guangxi Xinglong small hydropower project is a CDM-registered grid-displacement project with VVB-confirmed additionality via an investment test, but its integrity is significantly undermined by an extraordinary volume of 47 corrective actions and 21 material findings spanning additionality, baseline, and monitoring documentation. A contradiction in the baseline method (jurisdictional vs. project-specific) and a 25% discrepancy in claimed ERR figures between two monitoring reports introduce material uncertainty. The project's inherent low-risk profile as a hydro avoidance project partially offsets these documentation and data-reliability concerns.
Red Flags
- 47 corrective actions and 21 material findings reported across validation and monitoring, including 12+ items specifically challenging the additionality investment test (IRR calculation, investment timing, CDM awareness, benchmark application)
- Baseline method contradiction: the 2010 validation report describes a project-specific baseline while the 2017 monitoring report characterises it as jurisdictional — an unresolved discrepancy that affects the validity of the emission factor applied
- Claimed ERR differs by approximately 25% between the 2014 monitoring report (71,216 tCO₂e) and the 2017 monitoring report (88,926 tCO₂e) with no documented explanation for the upward revision
- Verified ERR figure is not available in the extracted record, preventing any pro-rata delivery check against the lifetime claim
- EIA approval date inconsistency flagged as a material finding (CAR34), raising questions about the regulatory approval timeline
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 20,278 | 0 | 20,278 | |
| 2013 | 41,075 | 0 | 41,075 | |
| 2015 | 63,780 | 0 | 63,780 | |
| Total | 125,133 | 0 | 125,133 |
Risk Indicators
VVB-confirmed but heavily queried
Avoidance project, no reversal risk
0% justified for grid-connected hydro
Method contradiction unresolved
Mentioned but FPIC and grievance mechanism unconfirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →