Guangxi Xinglong Small Hydropower Project

CDM-3478 ↗

#1107of 1935 in Renewable energy#617of 1084 in China#840of 1459 in CDM (UNFCCC)#360of 806 in AMS-I.D

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Guangxi Xinglong small hydropower project is a CDM-registered grid-displacement project with VVB-confirmed additionality via an investment test, but its integrity is significantly undermined by an extraordinary volume of 47 corrective actions and 21 material findings spanning additionality, baseline, and monitoring documentation. A contradiction in the baseline method (jurisdictional vs. project-specific) and a 25% discrepancy in claimed ERR figures between two monitoring reports introduce material uncertainty. The project's inherent low-risk profile as a hydro avoidance project partially offsets these documentation and data-reliability concerns.

Red Flags

  • 47 corrective actions and 21 material findings reported across validation and monitoring, including 12+ items specifically challenging the additionality investment test (IRR calculation, investment timing, CDM awareness, benchmark application)
  • Baseline method contradiction: the 2010 validation report describes a project-specific baseline while the 2017 monitoring report characterises it as jurisdictional — an unresolved discrepancy that affects the validity of the emission factor applied
  • Claimed ERR differs by approximately 25% between the 2014 monitoring report (71,216 tCO₂e) and the 2017 monitoring report (88,926 tCO₂e) with no documented explanation for the upward revision
  • Verified ERR figure is not available in the extracted record, preventing any pro-rata delivery check against the lifetime claim
  • EIA approval date inconsistency flagged as a material finding (CAR34), raising questions about the regulatory approval timeline

Credit Vintages

IssuedRetiredAvailable
2012
20,278020,278
2013
41,075041,075
2015
63,780063,780
Total125,1330125,133

Risk Indicators

Additionality

VVB-confirmed but heavily queried

Permanence

Avoidance project, no reversal risk

Leakage

0% justified for grid-connected hydro

Baseline

Method contradiction unresolved

Safeguards

Mentioned but FPIC and grievance mechanism unconfirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D, ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents