Guangxi Yizhou Sancha 21MW Hydropower Project

CDM-3402 ↗

#307of 1935 in Renewable energy#113of 1084 in China#197of 1459 in CDM (UNFCCC)#227of 1287 in ACM0002

6.1/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A 21 MW run-of-river hydropower project under CDM with a jurisdictional grid baseline and VVB-verified investment additionality. The project is fundamentally sound as an avoidance-type hydro credit, but 11 material findings at validation and an internal contradiction in the claimed ERR figures (126,341 vs 318,467 in the same monitoring report) introduce meaningful uncertainty about the credit volume and data reliability.

Red Flags

  • The monitoring report (2022-09-02) contains two different total ERR claimed values — 126,341 and 318,467 — within the same document, creating ambiguity about the actual credit volume issued.
  • Eleven material findings were raised at validation, including inconsistent turbine/generator specifications between the PDD and the contract, a misaligned baseline scenario definition, and an inadequately justified common-practice analysis region.
  • The verified ERR figure for the monitoring period (2011-04 to 2012-12) is not stated in the extracted record, preventing a direct pro-rata delivery check against the lifetime estimate.

Credit Vintages

IssuedRetiredAvailable
2011
45,631045,631
Total45,631045,631

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, reasonable for small hydro

Baseline

Jurisdictional grid EF, standard for CDM hydro

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not documented

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents