Skip to main content
GSBiogas - ElectricityChinaAMS-III.H

Guangzhou Zhujiang Beer Methane Recovery Project (300068)

GS-693 ↗ · current registry ID: GS401

#115of 268 in Biogas#681of 1084 in China#960of 1801 in Gold Standard (GS)#24of 55 in AMS-III.H

4.9/ 10
Integrity
5.0
Transparency
3.8
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A Gold Standard biogas-to-electricity project at a Chinese brewery that is currently delivering well below its ex-ante estimates (42% of PDD projections), which is conservative for claim safety but signals a poorly calibrated baseline. Key MRV gaps include a missing VVB name, no verified ERR figure, and no stated FN-RB or usage-monitoring method. The project's additionality rests on an investment test with no legal requirement to capture methane, but VVB confirmation is not documented.

Red Flags

  • Actual emission reductions are only 42% of the PDD estimate, with beer production down ~33% and wastewater treated down ~45% during the monitoring period, indicating the baseline assumptions were significantly optimistic
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
  • Grid emission factor differs by nearly 43% between the PDD (0.4975, 2015) and the monitoring report (0.87118, 2011), creating uncertainty about which value underpins credit issuance

Credit Vintages

IssuedRetiredAvailable
2009
2000200
2010
15,540015,540
2011
3,76803,768
Total19,508019,508

Risk Indicators

Additionality

Investment test present, VVB confirmation not documented

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' justification only

Baseline

Project-specific modeled baseline, last reassessed 2016

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance mechanism not confirmed

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05AMS III.H, AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents