Guayacán Hydroelectric Project
#217of 1935 in Renewable energy#3of 31 in Chile#131of 1459 in CDM (UNFCCC)#79of 806 in AMS-I.D
Audit Analysis
The Guayacán Hydroelectric Project is a CDM-registered small hydro scheme in Chile with a jurisdictional baseline and VVB-confirmed investment additionality test. The first monitoring period shows over-delivery relative to the pro-rata expectation, and no reversal or leakage concerns are inherent to the hydro-avoidance design. However, safeguards documentation is thin (no FPIC or grievance mechanism recorded), several key MRV parameters are absent, and multiple inter-document contradictions—though largely explainable—reduce confidence in data consistency.
Red Flags
- No FPIC or grievance mechanism documented despite safeguards being mentioned; indigenous and community engagement evidence is absent from the extracted record.
- Crediting period differs between the PDD (2010-11-01 to 2017-10-31) and the verification report (2011-04-30 to 2018-04-29), creating ambiguity about the actual registered period.
- Eleven Corrective Action Requests were raised during verification, including errors in the grid emission factor calculation and missing fuel-consumption data, indicating quality-control weaknesses in the monitoring process.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 20,665 | 0 | 20,665 | |
| Total | 20,665 | 0 | 20,665 |
Risk Indicators
VVB-confirmed investment test
Hydro avoidance – no inherent reversal risk
Deemed negligible, appropriate for hydro
Jurisdictional grid baseline
Mentioned but FPIC and grievance mechanism absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →