Skip to main content
CDMHydroChileAMS-I.D

Guayacán Hydroelectric Project

CDM-3830 ↗

#217of 1935 in Renewable energy#3of 31 in Chile#131of 1459 in CDM (UNFCCC)#79of 806 in AMS-I.D

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
6.0

Audit Analysis

The Guayacán Hydroelectric Project is a CDM-registered small hydro scheme in Chile with a jurisdictional baseline and VVB-confirmed investment additionality test. The first monitoring period shows over-delivery relative to the pro-rata expectation, and no reversal or leakage concerns are inherent to the hydro-avoidance design. However, safeguards documentation is thin (no FPIC or grievance mechanism recorded), several key MRV parameters are absent, and multiple inter-document contradictions—though largely explainable—reduce confidence in data consistency.

Red Flags

  • No FPIC or grievance mechanism documented despite safeguards being mentioned; indigenous and community engagement evidence is absent from the extracted record.
  • Crediting period differs between the PDD (2010-11-01 to 2017-10-31) and the verification report (2011-04-30 to 2018-04-29), creating ambiguity about the actual registered period.
  • Eleven Corrective Action Requests were raised during verification, including errors in the grid emission factor calculation and missing fuel-consumption data, indicating quality-control weaknesses in the monitoring process.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2013
20,665020,665
Total20,665020,665

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Hydro avoidance – no inherent reversal risk

Leakage

Deemed negligible, appropriate for hydro

Baseline

Jurisdictional grid baseline

Safeguards

Mentioned but FPIC and grievance mechanism absent

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS ID

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents