Skip to main content
CDMWindChinaACM0002

Guazhou Daliang East 47.5 MW large scale wind turbine wind farm project

CDM-6656 ↗

#497of 1935 in Renewable energy#203of 1084 in China#324of 1459 in CDM (UNFCCC)#372of 1287 in ACM0002

5.8/ 10
Integrity
5.8
Transparency
5.5
Claim Safety
6.5
Documentation
5.2

Audit Analysis

A 47.5 MW onshore wind project in China validated under CDM methodology ACM0002 v20.0 with a jurisdictional baseline and a 7-year crediting period. The project is structurally sound for a wind displacement project, but the extracted record lacks explicit additionality test details, monitoring data, and CORSIA/CCP eligibility information, leaving moderate evidence gaps.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, despite the project being validated by CTC with no material findings
  • No monitoring period or actual generation data found in the available documents; the verified ERR figure is identical to the ex-ante claim, suggesting no independent monitoring verification is documented
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not explicitly stated; VVB validation present but

Permanence

Avoidance project (grid displacement); no inherent reversal

Leakage

0% deduction, deemed negligible — appropriate for wind

Baseline

Jurisdictional baseline, grid EF 2017, reassessed 2020

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents