Guazhou Daliang East 47.5 MW large scale wind turbine wind farm project
#497of 1935 in Renewable energy#203of 1084 in China#324of 1459 in CDM (UNFCCC)#372of 1287 in ACM0002
Audit Analysis
A 47.5 MW onshore wind project in China validated under CDM methodology ACM0002 v20.0 with a jurisdictional baseline and a 7-year crediting period. The project is structurally sound for a wind displacement project, but the extracted record lacks explicit additionality test details, monitoring data, and CORSIA/CCP eligibility information, leaving moderate evidence gaps.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, despite the project being validated by CTC with no material findings
- No monitoring period or actual generation data found in the available documents; the verified ERR figure is identical to the ex-ante claim, suggesting no independent monitoring verification is documented
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not explicitly stated; VVB validation present but
Avoidance project (grid displacement); no inherent reversal
0% deduction, deemed negligible — appropriate for wind
Jurisdictional baseline, grid EF 2017, reassessed 2020
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →