Guizhou Pan County Yingwudashan Small-scale Hydro Power Project
#950of 1935 in Renewable energy#501of 1084 in China#691of 1459 in CDM (UNFCCC)#312of 806 in AMS-I.D
Audit Analysis
A small-scale hydro CDM project with a VVB-confirmed investment additionality test and a standard grid-displacement baseline, but the extracted record contains no monitoring or verification data, a low extraction confidence rating, and two inter-document contradictions (ERR figure and baseline method) that limit confidence in the project's actual performance and documentation quality.
Red Flags
- No monitoring report or verified ERR figure is present in the extracted record, making it impossible to confirm actual credit delivery against the 194,810 tCO2e ex-ante estimate
- Two contradictions between documents: the validation report states a project-specific baseline while the PDD states a jurisdictional baseline, and the financial document reports an ERR of 27,830 versus 194,810 in the validation report
- Nine material findings were logged during validation (inconsistent water-head values, incorrect power-shortage description, generator-type mismatch, etc.), indicating a PDD that required multiple corrections before approval
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the structured data may be incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for grid-fed hydro
Project-specific baseline, method contradiction between PDD
Safeguards and benefit sharing mentioned, but no FPIC or gri
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →