Guizhou Tongzihe Yuanmanguan Hydropower Project
#1248of 1935 in Renewable energy#733of 1084 in China#974of 1459 in CDM (UNFCCC)#968of 1287 in ACM0002
Audit Analysis
A small-scale CDM hydropower project in China with a jurisdictional grid baseline and VVB-verified additionality, but the verification report flags significant under-delivery (actual reductions 55% below the PDD estimate), metering irregularities, and a low project IRR of 5.62%. Multiple corrective actions were required, and contradictions in the reported emission figures and crediting period reduce confidence in the data.
Red Flags
- Verification report (Dec 2012) reports actual reductions of 12,423 tCO2e are 55.44% lower than the PDD estimate of 27,880 tCO2e for the same period
- Metering irregularities: wrong meters presented to the verification team, calibration records inconsistent or missing, and meters M1/M2 installed at the project substation rather than the PDD-specified split location
- Project IRR of only 5.62% based on the approved tariff of 0.25 yuan/kWh, well below the 0.31 yuan/kWh assumed in the Initial Design Report, raising additionality concerns
- Contradiction in crediting period: PDD (Apr 2010) states 2009-12-01 to 2016-11-30, while the monitoring report (Dec 2012) states 2010-05-05 to 2017-05-04
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 75,427 | 0 | 75,427 | |
| 2012 | 53,761 | 0 | 53,761 | |
| 2013 | 89,524 | 0 | 89,524 | |
| Total | 218,712 | 0 | 218,712 |
Risk Indicators
VVB-confirmed but low IRR (5.62%) and tariff below IDR estim
No reversal events reported
0% deduction, deemed negligible – appropriate for hydro
Jurisdictional grid EF (2007); last reassessment not stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →