Guizhou Wujiang Shatuo Hydropower Project
#614of 1935 in Renewable energy#291of 1084 in China#419of 1459 in CDM (UNFCCC)#470of 1287 in ACM0002
Audit Analysis
The Guizhou Wujiang Shatuo Hydropower Project is a CDM-registered avoidance-type hydro project with a VVB-confirmed investment additionality test and a jurisdictional baseline, both of which are sound for the project type. However, the absence of any monitoring-period data, verified emission reductions, or permanence documentation creates significant evidence gaps that limit confidence in the claimed ~18.5 million tCO₂e over the 2013–2020 crediting period. The low extraction confidence on source documents further weakens the evidentiary base.
Red Flags
- No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to cross-check the 18,499,175 tCO₂e lifetime claim against actual performance
- Minimum extraction confidence is rated low, indicating at least one key source document was poorly readable and the extracted facts may be incomplete
- Nine Corrective Action Requests were raised during validation (all subsequently closed), suggesting initial documentation or design gaps that required remediation
- No buffer pool, permanence mechanism, or reversal-risk assessment is documented, although inherent risk is low for a grid-displacement hydro project
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, minimal reversal risk
0% deduction, justified for grid displacement
Jurisdictional but no reassessment data
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →