Guizhou Zhenyuan Putian Hydropower Station
#1249of 1935 in Renewable energy#734of 1084 in China#975of 1459 in CDM (UNFCCC)#407of 806 in AMS-I.D
Audit Analysis
A small-scale CDM hydro project (AMS-I.D.) with a jurisdictional baseline and 100% verified ERR delivery over its full seven-year crediting period. However, two material findings in the validation report — a non-compliant PDD form version and a grid emission factor not aligned with the latest China DNA data — introduce meaningful uncertainty into the credit quantity. Low extraction confidence and several missing data points (additionality test type, safeguards detail, CORSIA/CCP status) limit the depth of assurance available.
Red Flags
- Material finding: the grid emission factor (EFgrid,CM,y) was not calculated in accordance with the latest data from the China DNA, directly affecting the ER calculation
- Material finding: the PDD did not comply with the latest CDM-SSC-PDD-FORM version 6.0, indicating a documentation compliance gap at validation
- Contradiction between the PDD (leakage 'deemed negligible') and another document (leakage 'quantified') on the same date, creating ambiguity in the leakage treatment
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the additionality assessment unverifiable from available data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 28,480 | 0 | 28,480 | |
| 2011 | 26,477 | 0 | 26,477 | |
| 2012 | 37,724 | 0 | 37,724 | |
| Total | 92,681 | 0 | 92,681 |
Risk Indicators
Test type not stated in extracted record
Hydro avoidance – no reversal risk
0% deduction; justification contradicted across docs
Jurisdictional grid EF (2014 China DNA)
Mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →