Guizhou Zunyi Landfill Gas Recovery and Utilization Project
#76of 189 in Methane#685of 1084 in China#899of 1459 in CDM (UNFCCC)#17of 34 in AMS-III.G
Audit Analysis
A CDM landfill gas recovery project in China with VVB-confirmed additionality via an investment test, but undermined by two ER calculation errors, a 23% downward revision in capture efficiency (65% to 50%), a 37% discrepancy in the grid emission factor across documents, and a 0% leakage deduction whose justification is inconsistent between the validation and monitoring reports. The absence of a verified ERR figure, buffer pool, and several key monitoring parameters limits confidence in the claimed 351,384 tCO₂e.
Red Flags
- Grid emission factor differs by 37% between the monitoring report (0.7134) and an undated appendix (0.9762), directly affecting the ER magnitude
- LFG capture efficiency was revised downward from 65% to 50% during validation, a 23% reduction that materially changes the credit calculation
- Two separate ER calculation errors (methane emission potential timing for year N and year 2022) were identified and corrected, indicating the initial PDD over-estimated credits
- Total verified ERR is not stated in the extracted record, preventing independent verification of the 351,384 tCO₂e claim
- Leakage deduction is 0% yet the justification is contradictory: the validation report (2012) calls it 'deemed negligible' while the monitoring report (2023) calls it 'quantified' without a stated value
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test; capture not legally required
landfill gas project
0% deduction; justification inconsistent across documents; n
Project-specific, modeled; no reassessment date stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →