Skip to main content
CDMLandfill gasChinaAMS-III.G

Guizhou Zunyi Landfill Gas Recovery and Utilization Project

CDM-6408 ↗

#76of 189 in Methane#685of 1084 in China#899of 1459 in CDM (UNFCCC)#17of 34 in AMS-III.G

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
6.0

Audit Analysis

A CDM landfill gas recovery project in China with VVB-confirmed additionality via an investment test, but undermined by two ER calculation errors, a 23% downward revision in capture efficiency (65% to 50%), a 37% discrepancy in the grid emission factor across documents, and a 0% leakage deduction whose justification is inconsistent between the validation and monitoring reports. The absence of a verified ERR figure, buffer pool, and several key monitoring parameters limits confidence in the claimed 351,384 tCO₂e.

Red Flags

  • Grid emission factor differs by 37% between the monitoring report (0.7134) and an undated appendix (0.9762), directly affecting the ER magnitude
  • LFG capture efficiency was revised downward from 65% to 50% during validation, a 23% reduction that materially changes the credit calculation
  • Two separate ER calculation errors (methane emission potential timing for year N and year 2022) were identified and corrected, indicating the initial PDD over-estimated credits
  • Total verified ERR is not stated in the extracted record, preventing independent verification of the 351,384 tCO₂e claim
  • Leakage deduction is 0% yet the justification is contradictory: the validation report (2012) calls it 'deemed negligible' while the monitoring report (2023) calls it 'quantified' without a stated value

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test; capture not legally required

Permanence

landfill gas project

Leakage

0% deduction; justification inconsistent across documents; n

Baseline

Project-specific, modeled; no reassessment date stated

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-III.G. Landfill Methane Recovery (version 06); AMS-I.D. Grid Connected Renewable Electricity Generation (version 17)

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents