Gunaydin WPP

GS-111 ↗

4.7 / 10
Integrity
5.2
Transparency
4.6
Claim Safety
4.8
Documentation
3.7

Score Breakdown

Integrity

verified Additionality was tested using an investment test and was confirmed by the VVB in the verification record.

missing The monitoring and verification history includes numerous corrective actions and clarifications, and the record shows a disputed credited period and emissions figure, which reduces confidence in the underlying accounting.

Transparency

verified The monitoring report dated 2025-06-12 provides a recent verification trail, named VVB, and a quantified verified emissions result of 66,623 tCO2e.

missing Extraction confidence is low and the evidence list is sparse, while several monitoring items were flagged as needing clarification or better supporting documents.

Claim Safety

verified Leakage is treated as negligible with a 0% deduction, which is favorable for a wind project.

missing The project is not shown to be CORSIA-ineligible, and CCP status is only noted as not mentioned, so dual-claim risk is not fully excluded.

Documentation

verified The file set includes a recent monitoring report, a named VVB, and a large number of extracted facts from official documents.

missing The extraction confidence is low, the evidence documents are not clearly enumerated, and the record contains many unresolved or repeatedly corrected monitoring issues.

Detailed Analysis

Integrity

The project has a positive additionality signal because the monitoring record says an investment test was used and that additionality was confirmed by the VVB, Re Carbon Ltd. The baseline is project-based and the report states a leakage deduction of 0% with leakage deemed negligible, which is reasonable for wind. However, the verification history includes many corrective actions and clarifications, and the record shows a reversal-related stakeholder concern about grazing land, even though no actual reversal events are reported.

Transparency

The monitoring report is recent and gives a quantified verified emissions reduction of 66,623 tCO2e for 2022-08-01 to 2024-10-15, which helps transparency. At the same time, low extraction confidence and the large number of unresolved or repeatedly corrected monitoring items weaken the clarity of the public record. Several monitoring elements were not fully documented in the extracted facts, including usage monitoring details and FNRB-related information.

Claim Safety

Claim safety is helped by the wind project type, the negligible leakage treatment, and the absence of reported reversals. Still, the record does not clearly state CORSIA eligibility, and CCP status is only noted as not mentioned, so the project cannot be treated as clearly excluded from dual-claim channels. The contradiction in verified emissions figures also raises over-crediting risk because the newer report’s 66,623 tCO2e differs from the older 59,792 tCO2e figure.

Documentation

Documentation quality is mixed: there is a recent monitoring report, a named verifier, and many extracted findings, but the extraction confidence is low. The report also contains a long list of corrective actions and clarifications, including meter calibration, supporting evidence, and monitoring-table issues. The crediting period is recent in the newer record, but the contradictory older period indicates that the documentation trail is not fully clean.

Overall

I privileged the newer monitoring report dated 2025-06-12 for the verified emissions figure and crediting period because it is more recent and appears to be the latest official record, but I still penalized the score because the older figures remain in the extracted record and create reliability concerns. The contradiction on the credited period is material: the newer report shows 2019-12-01 to 2026-11-30, while an older record shows 2012-12-01 to 2019-11-30, so the project history is not fully consistent. Likewise, the verified emissions reduction differs between 66,623 tCO2e and 59,792 tCO2e, which lowers confidence in the accounting and claim safety.

Audit Analysis

This wind project has some positive signs, including VVB-confirmed additionality, no reported reversals, and a leakage deduction of 0%. However, the record shows many corrective actions and clarifications, low extraction confidence, and a major inconsistency in the credited period and verified emissions figures, which weakens confidence in the claims. Overall, the project looks plausible but not especially robust from a documentation and claim-safety perspective.

Project Description

Developer: Fiba Yenilenebilir Enerji Holding A.Ş Type: Wind Size: Small Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2012-12-01 → 2026-11-30 Estimated annual credits: 19154 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth

Red Flags

  • The credited period is inconsistent across documents, with the newer monitoring report showing 2019-12-01 to 2026-11-30 while an older record shows 2012-12-01 to 2019-11-30.
  • The verified emissions reduction figure also conflicts across documents, with 66,623 tCO2e in the newer report versus 59,792 tCO2e in the older record.
  • The verification record contains many corrective actions and clarifications, including issues with meter data, monitoring tables, and supporting evidence.

Credit Vintages

Issued Retired Available
2012
1,773 1,773 0
2013
22,461 22,461 0
2014
20,608 20,608 0
2015
27,895 26,935 960
2016
36,126 35,813 313
2017
30,195 30,195 0
2018
30,772 30,772 0
2019
31,939 31,939 0
2020
13,755 11,798 1,957
2021
33,695 33,695 0
2022
31,832 99 31,733
2023
30,332 0 30,332
2024
22,375 0 22,375
Total 333,758 246,088 87,670

Cosa migliorerebbe questo punteggio

  • Publish a clean, reconciled emissions and crediting-period history that explains the difference between the older and newer figures.
  • Provide complete supporting evidence for monitoring parameters, including meter calibration, usage monitoring, and any omitted annexes or calculations.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals reported

Leakage

0% leakage deduction

Baseline

Project baseline, reassessment timing unclear

Safeguards

FPIC and grievance mechanism present

Double-claim

CCP/CORSIA status not clearly stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.