Guodian Barkol Santanghu Wind Farm Phase I 49.5MW Wind Project
#1019of 1935 in Renewable energy#560of 1084 in China#753of 1459 in CDM (UNFCCC)#802of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002 with a confirmed combined additionality test and jurisdictional baseline. However, the available record is limited to the 2012 validation report with no monitoring reports, no verified emission reduction figures, and a striking seven-fold discrepancy between the PDD's claimed lifetime reductions (690,837 tCO₂) and the VVB-validated figure (98,691 tCO₂), creating significant uncertainty about the project's actual credit volume.
Red Flags
- Seven-fold discrepancy in lifetime ERR between the PDD (690,837 tCO₂) and the validation report (98,691 tCO₂) — the VVB-validated figure is approximately 14% of the proponent's claim, raising questions about which figure was actually registered
- Grid emission factor conflict: the validation report uses 0.8964 tCO₂/MWh (2011) while an undated appendix cites 1.0001 tCO₂/MWh, a 12% difference that would materially alter credit volumes
- No monitoring reports, verified ERR figures, or post-validation data are present in the extracted record despite the crediting period ending in January 2020
- Crediting period dates differ between the PDD (Feb 2013 – Jan 2020) and an undated appendix (Nov 2012 – Oct 2019)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by VVB
Avoidance project, no reversal data
0% deemed negligible, reasonable for wind
Jurisdictional, 2011 grid EF
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →