Skip to main content
CDMWindChinaACM0002

Guodian Beipiao Taojiagou Wind Power Project

CDM-7058 ↗

#1108of 1935 in Renewable energy#620of 1084 in China#841of 1459 in CDM (UNFCCC)#863of 1287 in ACM0002

5.0/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A CDM wind power project in China using a well-established methodology (ACM0002) with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. However, the validation report identified five material findings including a monitoring inconsistency around a shared booster station, and no verified monitoring-period data or post-validation records were available in the extracted record, limiting confidence in actual delivery.

Red Flags

  • Validation report flagged a monitoring inconsistency: the PDD's description of net electricity generation did not match on-site findings regarding a shared booster station and joint gateway meter (CAR 03), raising MRV accuracy concerns.
  • No verified monitoring-period emissions reductions or monitoring period dates were found in any available document, making it impossible to confirm actual delivery against the claimed 98,739 tCO₂e/yr.
  • Letters of Approval from both the Chinese and Swiss DNAs were not provided during the on-site validation visit (CAR 01, CAR 02), a governance gap that was flagged as a corrective action.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project – no reversal risk

Leakage

0% – negligible for wind displacement

Baseline

Jurisdictional grid EF (0.9635, 2012)

Safeguards

Mentioned but no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents