Guodian Beipiao Taojiagou Wind Power Project
#1108of 1935 in Renewable energy#620of 1084 in China#841of 1459 in CDM (UNFCCC)#863of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China using a well-established methodology (ACM0002) with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. However, the validation report identified five material findings including a monitoring inconsistency around a shared booster station, and no verified monitoring-period data or post-validation records were available in the extracted record, limiting confidence in actual delivery.
Red Flags
- Validation report flagged a monitoring inconsistency: the PDD's description of net electricity generation did not match on-site findings regarding a shared booster station and joint gateway meter (CAR 03), raising MRV accuracy concerns.
- No verified monitoring-period emissions reductions or monitoring period dates were found in any available document, making it impossible to confirm actual delivery against the claimed 98,739 tCO₂e/yr.
- Letters of Approval from both the Chinese and Swiss DNAs were not provided during the on-site validation visit (CAR 01, CAR 02), a governance gap that was flagged as a corrective action.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project – no reversal risk
0% – negligible for wind displacement
Jurisdictional grid EF (0.9635, 2012)
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →