Guodian Jiaonan Ziluo Wind Farm Project
#952of 1935 in Renewable energy#503of 1084 in China#692of 1459 in CDM (UNFCCC)#746of 1287 in ACM0002
Audit Analysis
A CDM wind project validated in 2012 with a confirmed combined additionality test and reasonable leakage treatment, but significant data gaps in monitoring verification, permanence mechanisms, and a notable discrepancy in reported emission reduction figures between the PDD and validation report. The project's crediting period has expired (ended November 2019), and no post-validation monitoring data is available in the extracted record.
Red Flags
- Emission reduction figures differ by a factor of 7 between the PDD (563,003 tCO2) and the validation report (80,429 tCO2), likely reflecting an annual-vs-lifetime basis mismatch but creating material ambiguity in the claimed total
- Baseline method is described as 'project-specific' in the validation report but 'jurisdictional' in the PDD, creating uncertainty about which baseline was actually validated
- No monitoring period data or verified emission reductions are available in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Negligible, reasonable for wind
Project-specific, method contradicts PDD
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →