Guodian Laoting Daqinghe Wind Power Project
#847of 1935 in Renewable energy#435of 1084 in China#598of 1459 in CDM (UNFCCC)#660of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with VVB-confirmed additionality and a standard jurisdictional grid baseline, but significant documentation gaps including no verification reports and a major discrepancy between the PDD-claimed and VVB-validated emission reduction figures (692,489 vs 98,927 tCO2e). The project's structural integrity is reasonable for a grid-connected wind avoidance project, but the absence of any monitoring/verification data and the unresolved ERR contradiction limit confidence in actual delivery.
Red Flags
- Major ERR discrepancy: PDD (May 2012) claims 692,489 tCO2e while the validation report (July 2012) validates only 98,927 tCO2e — a ~7x gap that is not explained in the available documents
- No verification or monitoring reports found in the evidence set; actual credit delivery over the 2012–2019 crediting period is unconfirmed
- Eight material findings (3 CARs, 5 CLs) at validation, including missing Letter of Approval from the host Party and an incomplete monitoring plan for a shared booster station
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Negligible, grid-connected wind
Jurisdictional, 2009 grid EF, no reassessment data
Mentioned, benefit sharing described, no FPIC/grievance deta
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →