Guodian Liaocheng Biomass Power Project
#93of 352 in Biomass#561of 1084 in China#754of 1459 in CDM (UNFCCC)#14of 81 in ACM0006
Audit Analysis
The Guodian Liaocheng Biomass Power Project is a CDM biomass-to-electricity project with VVB-confirmed additionality and a standard grid-displacement baseline, but it is undermined by four cross-document contradictions (baseline method, leakage justification, ERR magnitude, and crediting period dates), a 0% leakage deduction with inconsistent rationale, and the absence of any verified ERR figure. The project's permanence risk is inherently low for a power-generation credit, yet the data-quality gaps and contradictory records limit confidence in the underlying claims.
Red Flags
- Four contradictions between the validation report (2010) and the monitoring report (2011/2013) on baseline method, leakage justification, total ERR, and crediting-period dates indicate inconsistent project documentation
- Leakage deduction is 0% with the justification shifting from 'deemed negligible' (validation report) to 'quantified' (monitoring report) without a clear quantified figure in the extracted record
- Total ERR verified is not stated in any available document, leaving no independently confirmed emission-reduction figure
- Grid emission factor is from 2009 and no updated or reassessed baseline value is found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 239,338 | 0 | 239,338 | |
| Total | 239,338 | 0 | 239,338 |
Risk Indicators
Combined test confirmed by DNV
Power-generation credit, no reversal risk
0% deduction, inconsistent justification
Project-specific, method contradicts validation report
Safeguards mentioned, benefit sharing described, no FPIC or
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →