Guodian Ningxia Qingtongxia Niushoushan Phase II 49.5MW Wind-farm project
#294of 1084 in China#422of 1459 in CDM (UNFCCC)#473of 1287 in ACM0002
Audit Analysis
A 49.5 MW CDM wind project in Ningxia, China, validated by Bureau Veritas with a combined additionality test and jurisdictional baseline. The ERR figures in the PDD and validation report are consistent once the annual-versus-total basis is reconciled (91,155 tCO₂e/yr × 7 yr = 638,085 tCO₂e lifetime). However, the absence of any monitoring report, low extraction confidence, and several unaddressed data gaps (buffer pool, reversal risk, CORSIA/CCP status) limit confidence in the project's verified performance.
Red Flags
- No monitoring report or verified ERR figure is present in the extracted record; actual credit delivery cannot be confirmed against the 638,085 tCO₂e lifetime claim.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines the reliability of the extracted facts.
- Three material findings were raised during validation (IRR calculation error, missing spare-wire electricity import in the monitoring plan, EIA date inconsistency); although all were corrected, they signal initial documentation weaknesses.
- Buffer pool percentage and reversal-event history are not stated in any available document, leaving permanence risk unquantified.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, justified as negligible
Jurisdictional, 2010 grid EF
Safeguards mentioned, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →