Guodian Ningxia Qingtongxia Niushoushan Phase III 49.5MW Wind-farm project
#736of 1084 in China#977of 1459 in CDM (UNFCCC)#970of 1287 in ACM0002
Audit Analysis
A 49.5 MW CDM wind project in China with a solid combined additionality test confirmed by Bureau Veritas and a jurisdictional grid-emission-factor baseline. However, a seven-fold discrepancy in claimed emissions reductions between the PDD and the validation report, combined with the absence of any monitoring or verification data and low extraction confidence, significantly limits confidence in the project's actual performance and data reliability.
Red Flags
- Seven-fold discrepancy in total claimed emissions reductions: the PDD (2011-12-04) states 637,427 tCO₂e while the validation report (2011-12-07) states 91,061 tCO₂e — a factor-of-7 gap that undermines data reliability
- No monitoring reports, verification reports, or verified ERR figures are present in the extracted record, making it impossible to assess actual delivery against the pro-rata expectation
- Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Wind – no biogenic reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF (0.918, 2010)
Mentioned but FPIC/grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →