Skip to main content
CDMWindChinaACM0002

Guodian Power Youyu Gaojiapu Phase II 49.5MW Windfarm Project

CDM-6178 ↗

#295of 1084 in China#423of 1459 in CDM (UNFCCC)#474of 1287 in ACM0002

5.6/ 10
Integrity
6.8
Transparency
4.2
Claim Safety
5.8
Documentation
4.8

Audit Analysis

A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002 with a VVB-confirmed combined additionality test and a jurisdictional baseline. The project is an avoidance-type wind installation with inherently low reversal risk and a reasonable negligible-leakage claim, but the available record contains only validation-stage documents with no monitoring or verification data, and a significant seven-fold discrepancy in the claimed emission reduction figure between the PDD and the validation report.

Red Flags

  • The PDD (April 2012) reports a total ERR of 589,799 tCO₂e while the validation report (August 2012) reports 84,257 tCO₂e — a roughly 7× discrepancy that, if the PDD figure were used for credit issuance, would represent severe over-crediting.
  • No monitoring reports, verification reports, or verified ERR figures are present in the extracted record, making it impossible to confirm actual delivery against the claimed baseline.
  • No FPIC, grievance mechanism, or detailed safeguards documentation was found in the available documents, despite safeguards being flagged as mentioned.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, minimal reversal risk

Leakage

Negligible, consistent with wind

Baseline

Jurisdictional grid EF (2011)

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents