Guodian Shanxi Jingle Suopo Wind Power Project
#1252of 1935 in Renewable energy#738of 1084 in China#979of 1459 in CDM (UNFCCC)#972of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Shanxi, China, validated by TÜV Rheinland with a jurisdictional grid baseline and a VVB-confirmed combined additionality test. However, the available record is limited to the 2012 validation report with no monitoring or verification data, a 10× discrepancy in the claimed ERR between the PDD and validation report, and low extraction confidence, all of which significantly limit confidence in the project's actual performance and data reliability.
Red Flags
- The PDD states a total ERR of 938,980 tCO2e while the validation report states 93,898 tCO2e — a 10× discrepancy that undermines confidence in the project's credit volume
- No monitoring report or verified ERR figure is available in the extracted record, making it impossible to confirm actual delivery against the claimed baseline
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the structured data may be incomplete or unreliable
- No FPIC, grievance mechanism, or explicit safeguards documentation was found despite the project being in a rural Chinese community
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% with negligible justification
Jurisdictional, no reassessment data
Mentioned but FPIC/grievance absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →