Guodian Shanxi Pinglubeishan Phase I Wind Power Project
#1371of 1935 in Renewable energy#832of 1084 in China#1106of 1459 in CDM (UNFCCC)#1058of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a verified combined additionality test and jurisdictional baseline, but hampered by a seven-fold discrepancy between the PDD and validation report on total emissions reductions, twelve material findings (including missing Letters of Approval from both national authorities), and a near-complete absence of monitoring or verification data. The project is a straightforward renewable-energy avoidance activity with low inherent reversal risk, yet the documentation record is thin and the ERR contradiction undermines confidence in the claimed credit volume.
Red Flags
- Total ERR discrepancy of ~7× between the PDD (602,791 tCO₂e) and the validation report (86,113 tCO₂e) raises serious questions about which figure was actually issued
- CAR01: Letters of Approval from the Designated National Authorities of both China and the Netherlands were not obtained at validation, a fundamental CDM compliance requirement
- No monitoring reports, verification reports, or verified ERR figures are present in the extracted record, making it impossible to confirm whether any credits were actually issued or retired
- Twelve material findings and seven corrective actions were raised by the VVB, indicating the PDD required substantial revision before validation could be completed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional but no reassessment data
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →