Guodian Shanxi Youyu Caojiashan Phase II Wind Power Project
#1314of 1935 in Renewable energy#792of 1084 in China#1040of 1459 in CDM (UNFCCC)#1018of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a confirmed combined additionality test and a standard jurisdictional grid baseline, but the extracted record contains no monitoring or verification data, 12 material findings from the validation report (including a monitoring-plan inconsistency), and a contradiction on the leakage treatment. The absence of any post-validation evidence and the project's expired crediting period (ended January 2019) limit confidence in the 585,095 tCO₂e claim.
Red Flags
- CAR05 in the validation report flags that the monitoring plan is not consistent with actual conditions, raising doubt about whether emissions were correctly tracked during the crediting period
- No monitoring report, verification report, or verified ERR figure appears in the extracted record, so the 585,095 tCO₂e lifetime claim is entirely unverified
- Contradiction on leakage: the validation report states leakage was 'deemed negligible' while an appendix references a 'quantified' approach, leaving the actual treatment ambiguous
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind – no biogenic reversal risk
0% deduction; justification contradicted by appendix
Jurisdictional grid EF (0.9309, 2010)
Mentioned but no FPIC or grievance mechanism documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →