Guodian Shuozhou Haifeng Hutoushan Phase II 49.5MW Wind farm Project
#1427of 1935 in Renewable energy#875of 1084 in China#1165of 1459 in CDM (UNFCCC)#1096of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002, with a combined additionality test confirmed by SGS United Kingdom. The project's core design is sound for a wind farm, but the available record is limited to the validation report and PDD, with no monitoring or verification reports, low extraction confidence, and a notable contradiction on the baseline classification between the two documents.
Red Flags
- Baseline method is contradictory: the validation report (Oct 2012) classifies it as 'project' while the PDD (Oct 2012) classifies it as 'jurisdictional', creating ambiguity about the baseline's robustness.
- No monitoring or verification reports are present in the extracted record; the identical claimed and verified ERR figures (651,882 tCO₂e) reflect the ex-ante validation estimate, not actual monitored performance.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted data.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deemed negligible, reasonable for wind
Project-specific, classification contradicted in PDD
Mentioned and benefit sharing described, but no FPIC or grie
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →