Audit Analysis
A 49.5 MW onshore wind project in China registered under CDM with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality, but the available record is limited to the validation stage (2012) with no monitoring reports, no verified emissions reductions, and a seven-fold discrepancy between the PDD and validation report ERR figures. The project's crediting period ended in November 2020, yet no post-validation performance data has been extracted, leaving permanence and actual delivery unverified.
Red Flags
- ERR contradiction: the PDD (March 2012) reports 567,203 tCO₂e while the validation report (July 2012) reports 81,029 tCO₂e — a factor-of-seven difference that is not explained in the extracted record
- No monitoring reports or verified ERR figures are present in the available documents, so actual credit delivery cannot be confirmed
- Five corrective actions and seven clarifications were required at validation, including missing Letters of Approval from both DNAs and an outdated common-practice analysis
- No buffer pool, permanence mechanism, or reversal-event data is documented for the project
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0 % deemed negligible, consistent with wind
Jurisdictional grid EF (0.895875, 2011)
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →