Guodian Weichang wind and photovoltaic power project
#1373of 1935 in Renewable energy#834of 1084 in China#1108of 1459 in CDM (UNFCCC)#1060of 1287 in ACM0002
Audit Analysis
A CDM-era wind and PV project in China with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality, but undermined by a seven-fold discrepancy between the PDD and validation report ERR figures, numerous material findings at validation, and the absence of any verified monitoring data in the extracted record. The project type (avoidance of grid electricity) inherently carries low reversal and leakage risk, yet the data reliability issues and documentation gaps prevent a higher confidence assessment.
Red Flags
- Seven-fold ERR discrepancy: the PDD (2012-10-22) states 703,416 tCO₂e while the validation report (2012-10-23) states 100,488 tCO₂e — a 7× difference that is unexplained in the extracted record and raises serious data-reliability concerns.
- Ten material findings (5 CARs + 5 CLs) at validation, including missing Letters of Approval, an incomplete project boundary (NECPG omitted), and inconsistent technical specifications, indicating a weak initial design submission.
- No verified ERR figure is available in the extracted record; the monitoring period (2012–2019) has fully elapsed yet no verification data was captured.
- Grid emission factor of 0.8958 tCO₂/MWh is drawn from 2009 data, which is dated even for a CDM-era project.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deemed negligible, appropriate for wind/PV
Jurisdictional grid EF (0.8958, 2009)
Mentioned, benefit sharing described; FPIC and grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →